Lexus NX: Inspection

INSPECTION

PROCEDURE

1. INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

4 (+) - 1 (GND)

Switch not pushed

10 kΩ or higher

Switch pushed

Below 1 Ω

If the result is not as specified, replace the integration control and panel assembly (VSC OFF switch).

*a

Component without harness connected

(Integration Control and Panel Assembly (VSC OFF Switch))

READ NEXT:

 Installation

INSTALLATION PROCEDURE 1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH) (a) Install the integration control and panel assembly (VSC OFF switch) to the upper rear console panel sub

 Brake System (other)

 Brake Booster

SEE MORE:

 Components

COMPONENTS ILLUSTRATION *1 FRONT SEAT INNER BELT ASSEMBLY LH *2 FRONT SEAT INNER BELT ASSEMBLY RH *3 FRONT SEAT BELT ANCHOR PLATE - - N*m (kgf*cm, ft.*lbf): Specified torque - -

 Freeze Frame Data

FREEZE FRAME DATA FREEZE FRAME DATA (a) Whenever a DTC is detected, the headlight ECU sub-assembly or front recognition camera stores the current vehicle (sensor) state as freeze frame data. CHECK FREEZE FRAME DATA (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn t

© 2016-2026 Copyright www.lexunx.com