Lexus NX: Inspection
INSPECTION
PROCEDURE
1. INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH)
| (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: | Tester Connection | Condition | Specified Condition | | 4 (+) - 1 (GND) | Switch not pushed | 10 kΩ or higher | | Switch pushed | Below 1 Ω | If the result is not as specified, replace the integration control and panel assembly (VSC OFF switch). | | | *a | Component without harness connected (Integration Control and Panel Assembly (VSC OFF Switch)) | | |
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH) (a) Install the integration control and panel assembly (VSC OFF switch) to the upper rear console panel sub
SEE MORE:
INSTALLATION CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedures listed below are for the LH side.
PROCEDURE 1. INSTALL FRONT DOOR LOWER OUTSIDE MOULDING SUB-ASSEMBLY LH HINT: When installing the front door lower outside moulding sub-assembly LH, heat
INSPECTION PROCEDURE 1. INSPECT POWER WINDOW REGULATOR MOTOR ASSEMBLY LH NOTICE:
Do not apply voltage to any terminals except terminals 1 and 2 to avoid damaging the pulse sensor inside the motor.
Reset the power window regulator motor (initialize the pulse sensor) after installing the power wi
© 2016-2026 Copyright www.lexunx.com
