INSTALLATION PROCEDURE 1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY (a) Connect the 2 connectors. (b) Attach the 6 clips to install the air conditioning control assembly. NOTICE: Do not touch the switch, display or clock parts. 2. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBL
PRECAUTION FUEL RECEIVER GAUGE OPERATION (a) OPERATION The combination meter assembly uses the fuel injection volume signal from the ECM, fuel sender gauge assembly to detect the amount of fuel remaining in the fuel tank assembly. Each gauge assembly has a variable resistor whose resistance changes