INSTALLATION PROCEDURE 1. INSTALL NO. 1 AMPLIFIER ANTENNA ASSEMBLY (a) Attach the guide and install the No. 1 amplifier antenna assembly with the bolt. Torque: 8.3 N·m {85 kgf·cm, 73 in·lbf} (b) Connect the 2 connectors. 2. INSTALL BACK DOOR TRIM BOARD ASSEMBLY Click here 3. INSTALL BACK DOOR
DESCRIPTION When the combination meter receives a hazard warning signal switch signal, the flasher IC turns on and hazard control is performed. WIRING DIAGRAM CAUTION / NOTICE / HINT NOTICE: When replacing the combination meter assembly, make sure to replace it with a new one. PROCEDURE 1. RE