Lexus NX: Hv Battery

READ NEXT:

 Charging

CHARGING PROCEDURE 1. PRECAUTION CAUTION: Be sure to read Precaution thoroughly before servicing. Click here 2. INSPECT AUXILIARY BATTERY VOLTAGE Click here 3. PREPARATION FOR HV BATTERY CHARGING

 Hv Relay Assembly

 Components

COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified

SEE MORE:

 Inspection

INSPECTION PROCEDURE 1. INSPECT INTEGRATION CONTROL AND PANEL ASSEMBLY (BRAKE HOLD SWITCH) (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 8 (SLT1) - 16 (GND1) Switch not pushed 1 MΩ or

 Installation

INSTALLATION PROCEDURE 1. PRECAUTION CAUTION: Be sure to read precaution thoroughly before servicing. Click here 2. INSTALL REAR TIRE PRESSURE MONITOR INITIATOR (a) Install the rear tire pressure monitor initiator with the 2 nuts. Torque: 8.3 N·m {85 kgf·cm, 73 in·lbf} (b) Connect the grommet.

© 2016-2026 Copyright www.lexunx.com