CHARGING PROCEDURE 1. PRECAUTION CAUTION: Be sure to read Precaution thoroughly before servicing. Click here 2. INSPECT AUXILIARY BATTERY VOLTAGE Click here 3. PREPARATION FOR HV BATTERY CHARGING
DESCRIPTION The inverter activation signal is sent to the compressor with motor assembly from the hybrid vehicle control ECU. Compressor control is stopped and this DTC is stored if there is an open or short in the signal circuit. DTC No. Detection Item DTC Detection Condition Trouble Area
INSTALLATION PROCEDURE 1. INSTALL QUICK HEATER ASSEMBLY (a) Install the quick heater assembly with the screw. (b) Attach the clamp and connect the 2 connectors. 2. INSTALL NO. 1 AIR DUCT Click here 3. INSTALL LOWER INSTRUMENT PANEL Click here