Lexus NX: Inspection

INSPECTION

PROCEDURE

1. INSPECT TILT AND TELESCOPIC SWITCH

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Switch Condition

Specified Condition

1 (VC) - 3 (MSW)

Tilt up

342 to 378 Ω

Tilt down

1890.5 to 2089.5 Ω

Telescopic contract

750.5 to 829.5 Ω

Telescopic extend

152 to 168 Ω

If the result is not as specified, replace the tilt and telescopic manual switch.

*a

Component without harness connected

(Tilt and Telescopic Manual Switch)

READ NEXT:

 Installation

INSTALLATION PROCEDURE 1. INSTALL TILT AND TELESCOPIC SWITCH (a) Attach the claw to install the tilt and telescopic switch. (b) Connect the connector. 2. INSTALL LOWER STEERING COLUMN COVER (a) Attach

 Steering Gear / Linkage

 Steering Gear

SEE MORE:

 Brake Hold Standby Indicator Light Circuit

DESCRIPTION The brake hold standby indicator light turns on if brake hold control is possible when the following conditions required for operation standby are met and the brake hold switch (integration control and panel assembly) is turned on while the power switch is on (IG). Conditions required

 Performance Damper

ComponentsCOMPONENTS ILLUSTRATION *1 SUSPENSION TOWER DAMPER - - N*m (kgf*cm, ft.*lbf): Specified torque - - RemovalREMOVAL PROCEDURE 1. REMOVE WINDSHIELD WIPER MOTOR ASSEMBLY Click here 2. REMOVE SUSPENSION TOWER DAMPER (a) Remove the 2 nuts and the suspension tower d

© 2016-2025 Copyright www.lexunx.com