Lexus NX: Installation

INSTALLATION

PROCEDURE

1. INSTALL NO. 1 AMPLIFIER ANTENNA ASSEMBLY

(a) Attach the guide and install the No. 1 amplifier antenna assembly with the bolt.

Torque:

8.3 N·m {85 kgf·cm, 73 in·lbf}

(b) Connect the 2 connectors.

2. INSTALL BACK DOOR TRIM BOARD ASSEMBLY

Click here

3. INSTALL BACK DOOR LOCK COVER (w/o Power Back Door)

Click here

4. INSTALL BACK DOOR LOCK COVER (w/ Power Back Door)

Click here

5. INSTALL BACK DOOR FINISH COVER RH (w/o Power Back Door)

Click here

6. INSTALL BACK DOOR FINISH COVER LH (w/o Power Back Door)

Click here

7. INSTALL BACK DOOR TRIM BASE (w/ Power Back Door)

Click here

8. INSTALL PULL HANDLE (w/ Power Back Door)

Click here

9. INSTALL BACK DOOR SIDE GARNISH RH

Click here

10. INSTALL BACK DOOR SIDE GARNISH LH

Click here

11. INSTALL BACK DOOR CENTER GARNISH

Click here

READ NEXT:

 Asc Ecu

 Components

COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified

 Removal

REMOVAL PROCEDURE 1. REMOVE DECK BOARD ASSEMBLY Click here 2. REMOVE NO. 3 DECK BOARD SUB-ASSEMBLY Click here 3. REMOVE REAR DECK FLOOR BOX Click here 4. REMOVE DECK FLOOR BOX LH Click here 5.

SEE MORE:

 Removal

REMOVAL CAUTION / NOTICE / HINT NOTICE: Do not replace the spiral with sensor cable sub-assembly with the battery connected and the power switch on (IG). Do not rotate the spiral with sensor cable sub-assembly when the following conditions are met: 1) The steering wheel is removed, 2) the batte

 Cold Start Ignition Timing Performance (P050B)

MONITOR DESCRIPTION This monitor will run when the engine is started at an engine coolant temperature of -10 to 50°C (14 to 122°F). The DTC is stored after the engine idles for 13 seconds (2 trip detection logic). The DTC is designed to monitor the ignition timing at cold start. When the engine is

© 2016-2026 Copyright www.lexunx.com