Lexus NX: Installation

INSTALLATION

PROCEDURE

1. INSTALL NO. 1 AMPLIFIER ANTENNA ASSEMBLY

(a) Attach the guide and install the No. 1 amplifier antenna assembly with the bolt.

Torque:

8.3 N·m {85 kgf·cm, 73 in·lbf}

(b) Connect the 2 connectors.

2. INSTALL BACK DOOR TRIM BOARD ASSEMBLY

Click here

3. INSTALL BACK DOOR LOCK COVER (w/o Power Back Door)

Click here

4. INSTALL BACK DOOR LOCK COVER (w/ Power Back Door)

Click here

5. INSTALL BACK DOOR FINISH COVER RH (w/o Power Back Door)

Click here

6. INSTALL BACK DOOR FINISH COVER LH (w/o Power Back Door)

Click here

7. INSTALL BACK DOOR TRIM BASE (w/ Power Back Door)

Click here

8. INSTALL PULL HANDLE (w/ Power Back Door)

Click here

9. INSTALL BACK DOOR SIDE GARNISH RH

Click here

10. INSTALL BACK DOOR SIDE GARNISH LH

Click here

11. INSTALL BACK DOOR CENTER GARNISH

Click here

READ NEXT:

 Asc Ecu

 Components

COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified

 Removal

REMOVAL PROCEDURE 1. REMOVE DECK BOARD ASSEMBLY Click here 2. REMOVE NO. 3 DECK BOARD SUB-ASSEMBLY Click here 3. REMOVE REAR DECK FLOOR BOX Click here 4. REMOVE DECK FLOOR BOX LH Click here 5.

SEE MORE:

 Hybrid Generator Performance (P0A92-261)

DTC SUMMARY MALFUNCTION DESCRIPTION This DTC indicates that magnetic force deterioration of the permanent magnet located in the rotor inside the generator has been detected. The cause of this malfunction may be one of the following: Area Main Malfunction Description Step Inverter low-volt

 Installation

INSTALLATION PROCEDURE 1. INSTALL BLOWER ASSEMBLY (a) Attach the 2 claws to install the blower assembly. (b) Install the 2 screws. (c) Attach the 3 clamps to install the air conditioning harness assembly. (d) Connect the No. 1 blower damper servo sub-assembly connector. 2. INSTALL AIR CONDITIONING U

© 2016-2022 Copyright www.lexunx.com