Lexus NX: Installation

INSTALLATION

PROCEDURE

1. INSTALL MULTIPLEX TILT AND TELESCOPIC ECU

(a) Attach the claw and install the multiplex tilt and telescopic ECU to the bracket.

(b) Install the bolt and multiplex tilt and telescopic ECU to the electric power steering column sub-assembly.

(c) Connect the connector and harness clamp.

2. INSTALL LOWER STEERING COLUMN COVER

Click here

3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

4. INITIALIZATION AFTER RECONECTING AUXILIARY BATTERY TERMINAL

Click here

HINT:

When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.

Click here

5. INSTALL DECK FLOOR BOX LH

Click here

6. INSTALL REAR DECK FLOOR BOX

Click here

7. INSTALL NO. 3 DECK BOARD SUB-ASSEMBLY

Click here

8. CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM

(a) Reset the auto tilt away function setting to the previous condition by changing the customize parameter.

Click here

READ NEXT:

 Removal

REMOVAL PROCEDURE 1. PRECAUTION NOTICE: After turning the power switch is turned off, there may be a waiting time before disconnecting the auxiliary negative (-) battery terminal. Click here 2. CUST

 Power Tilt And Power Telescopic Steering Column System

 Precaution

PRECAUTION PRECAUTION FOR DISCONNECTING CABLE FROM NEGATIVE AUXILIARY BATTERY TERMINAL NOTICE: After turning the power switch off, waiting time may be required before disconnecting the cable from t

SEE MORE:

 Freeze Frame Data

FREEZE FRAME DATA FREEZE FRAME DATA (a) Whenever a lighting system DTC is stored, the forward recognition camera stores the current vehicle state as freeze frame data. CHECK FREEZE FRAME DATA (a) Connect the Techstream to the DLC3. (b) Turn the power switch off. (c) Turn the Techstream on. (d) Enter

 Reassembly

REASSEMBLY PROCEDURE 1. INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY Click here 2. INSTALL NO. 4 ROOF HEADLINING SUPPORT (for Normal Roof) (a) Align the No. 4 roof headlining support with the marking on the roof headlining and install the No. 4 roof headlining support using double-sided tape or hot

© 2016-2026 Copyright www.lexunx.com