Lexus NX: Installation

INSTALLATION

CAUTION / NOTICE / HINT

HINT:

  • Use the same procedure for the RH and LH sides.
  • The procedure listed below is for the LH side.
  • A bolt without a torque specification is shown in the standard bolt chart.

    Click here

PROCEDURE

1. INSTALL POWER WINDOW REGULATOR MOTOR ASSEMBLY LH

(a) Using a T25 "TORX" socket wrench, install the power window regulator motor assembly LH with the 3 "TORX" screws.

Torque:

5.4 N·m {55 kgf·cm, 48 in·lbf}

HINT:

A new power window regulator motor assembly LH uses self-tapping screws to thread new installation holes when the self-tapping screws are inserted.

2. INSTALL REAR DOOR WINDOW REGULATOR SUB-ASSEMBLY LH

Click here

3. INSTALL REAR DOOR GLASS SUB-ASSEMBLY LH

Click here

4. INSTALL REAR DOOR REAR GUIDE SEAL LH

Click here

5. INSTALL REAR LOWER REAR DOOR WINDOW FRAME SUB-ASSEMBLY LH

Click here

6. INSTALL REAR DOOR GLASS RUN LH

Click here

7. INSTALL REAR DOOR SERVICE HOLE COVER LH

Click here

8. INSTALL REAR DOOR ARMREST SET BRACKET LH

Click here

9. INSTALL REAR DOOR TRIM BOARD SUB-ASSEMBLY LH

Click here

10. INSTALL REAR DOOR TRIM COVER LH

Click here

11. INSTALL REAR DOOR INSIDE HANDLE BEZEL PLUG LH

Click here

12. INSTALL REAR POWER WINDOW REGULATOR SWITCH ASSEMBLY WITH REAR DOOR ARMREST BASE PANEL

Click here

13. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

14. INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL

Click here

HINT:

When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function that completes learning when the respective system is used.

Click here

15. INSTALL DECK FLOOR BOX LH

Click here

16. INSTALL REAR DECK FLOOR BOX

Click here

17. INSTALL NO. 3 DECK BOARD SUB-ASSEMBLY

Click here

18. INITIALIZE POWER WINDOW CONTROL SYSTEM

Click here

19. CHECK POWER WINDOW

Click here

READ NEXT:

 Quarter Window Glass

 Components

COMPONENTS ILLUSTRATION *1 DECK BOARD ASSEMBLY *2 NO. 2 DECK BOARD SUB-ASSEMBLY *3 NO. 3 DECK BOARD SUB-ASSEMBLY *4 TONNEAU COVER ASSEMBLY ILLUSTRATION *1 DECK FLOOR BOX L

 Removal

REMOVAL CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. REMOVE TONNEAU COVER ASSEMBLY Click here

SEE MORE:

 Removal

REMOVAL CAUTION / NOTICE / HINT CAUTION: Wear protective gloves. Sharp areas on the parts may injure your hands. PROCEDURE 1. REMOVE NO. 3 DECK BOARD SUB-ASSEMBLY Click here 2. REMOVE REAR DECK FLOOR BOX Click here 3. REMOVE DECK FLOOR BOX LH Click here 4. PRECAUTION CAUTION: Be sure to read P

 Steering Heater Switch

InspectionINSPECTION PROCEDURE 1. REMOVE NO. 2 COMBINATION SWITCH ASSEMBLY Click here 2. INSPECT NO. 2 COMBINATION SWITCH ASSEMBLY (a) Measure the voltage according to the value (s) in the table below. Standard Voltage: Tester Connection (Positive (+) Tester Probe - Negative (-) Tester Pro

© 2016-2024 Copyright www.lexunx.com