Lexus NX: Utility

UTILITY

INITIALIZE THE CONNECTION INFORMATION OF A GATEWAY FUNCTION EQUIPPED ECU (BUS MONITOR ECU)

(a) Connect the Techstream to the DLC3.

(b) Turn the power switch on (IG).

(c) Turn the Techstream on.

(d) Enter the following menus: Body Electrical / Central Gateway or Main Body / Utility.

(e) Select Initialization from Utility to initialize the ECU.

Body Electrical > Central Gateway > Utility

Tester Display

Initialization

Body Electrical > Main Body > Utility

Tester Display

Initialization

READ NEXT:

 Problem Symptoms Table

PROBLEM SYMPTOMS TABLE HINT: Use the table below to help determine the cause of problem symptoms. If multiple suspected areas are listed, the potential causes of the symptoms are listed in order of

 Terminals Of Ecu

TERMINALS OF ECU NOTICE: After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Click here When discon

 Diagnosis System

DIAGNOSIS SYSTEM CHECK FOR INSTALLED SYSTEMS (ECUS AND SENSORS) THAT USE CAN COMMUNICATION (a) The systems (ECUs and sensors) that use CAN communication vary depending on the vehicle and optional equi

SEE MORE:

 Network Gateway Ecu

ComponentsCOMPONENTS ILLUSTRATION *1 NETWORK GATEWAY ECU - - RemovalREMOVAL PROCEDURE 1. REMOVE ECU INTEGRATION BOX RH Click here 2. REMOVE NETWORK GATEWAY ECU (a) Detach the 2 claws and remove the network gateway ECU. InstallationINSTALLATION PROCEDURE 1. INSTALL NETWORK GATEWAY

 Adjustment

ADJUSTMENT CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. PREPARE VEHICLE FOR FOG LIGHT AIM ADJUSTMENT (a) Prepare the vehicle: Ensure that there is no damage or deformation to the vehicle body arou

© 2016-2025 Copyright www.lexunx.com