SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL GLOVE BOX LIGHT ASSEMBLY (a) Attach the 2 claws to install the glove box light assembly. 2. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY Click here 3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL 4. INITIALIZATION AFTER RECONNECTING AUXILIARY
SYSTEM DESCRIPTION SLIDING ROOF SYSTEM DESCRIPTION (a) The sliding roof system controls the sliding roof operation using the sliding roof drive gear sub-assembly (sliding roof ECU). Operating the map light assembly sliding (slide roof switch) results in electrical power being transmitted to the slid