Lexus NX: Installation

INSTALLATION

CAUTION / NOTICE / HINT

HINT:

  • Use the same procedure for the RH and LH sides.
  • The procedure listed below is for the LH side.

PROCEDURE

1. INSTALL ROOF RACK ASSEMBLY

(a) Install the roof rack assembly with the 5 nuts.

Torque:

16 N·m {163 kgf·cm, 12 ft·lbf}

2. INSTALL ROOF HEADLINING ASSEMBLY

Click here

READ NEXT:

 Side Mudguard

 Components

COMPONENTS ILLUSTRATION *1 SIDE MUDGUARD SUB-ASSEMBLY LH *2 GROMMET ● Non-reusable part - - ILLUSTRATION *1 NO. 3 MOULDING TAPE - - ● Non-reusable part -

 Removal

REMOVAL CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. REMOVE SIDE MUDGUARD SUB-ASSEMBLY LH HINT: Whe

SEE MORE:

 Oxygen Sensor Circuit (Bank 1 Sensor 2) (P0136-P0139,P013A)

DESCRIPTION In order to obtain a high purification rate of the carbon monoxide (CO), hydrocarbon (HC) and nitrogen oxide (NOx) components in the exhaust gas, a TWC (Three-Way Catalytic Converter) is used. For the most efficient use of the TWC, the air fuel ratio must be precisely controlled so that

 Mirror Heater does not Operate with Rear Defogger Switch

DESCRIPTION When therear window defogger switch (mirror heater switch) is operated, a mirror heater signal is sent to the air conditioning amplifier assembly via LIN communication. The air conditioning amplifier assembly sends the signal to the outer mirror control ECU assembly via CAN communication

© 2016-2026 Copyright www.lexunx.com