Lexus NX: Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
-
Use the same procedure for the RH and LH sides.
-
The procedure listed below is for the LH side.
PROCEDURE
1. INSTALL ROOF RACK ASSEMBLY
(a) Install the roof rack assembly with the 5 nuts.
Torque:
16 N·m {163 kgf·cm, 12 ft·lbf}
2. INSTALL ROOF HEADLINING ASSEMBLY
Click here
READ NEXT:
COMPONENTS ILLUSTRATION *1 SIDE MUDGUARD SUB-ASSEMBLY LH *2 GROMMET ● Non-reusable part - - ILLUSTRATION *1 NO. 3 MOULDING TAPE - - ● Non-reusable part -
REMOVAL CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE 1. REMOVE SIDE MUDGUARD SUB-ASSEMBLY LH HINT: Whe
SEE MORE:
On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT NO. 1 MIRROR RELAY (a) Remove the No. 1 mirror relay. (b) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 3 - 5 Battery voltage
DTC SUMMARY DTC No. Detection Item DTC Detection Condition Trouble Area MIL Memory P043E Evaporative Emission System Leak Detection Reference Orifice Low Flow Reference orifice clogged during key-off EVAP monitor
Canister pump module
Connector/wire harness (Canister pump
© 2016-2025 Copyright www.lexunx.com
