Lexus NX: Operation Check
			
			
			OPERATION CHECK
 AFS (FRONT-LIGHTING ADAPTIVE SYSTEM) OPERATION CHECK
 NOTICE:
 Make sure that the customize settings are set to default when performing the AFS (front-lighting adaptive system) operation check.
 (a) Perform the following operation with the low beam headlights on and check that the headlight ECU sub-assembly LH performs low speed control of the AFS (front-lighting adaptive system):
   - 
Drive the vehicle at a speed between 10 km/h (6 mph) and 30 km/h (19 mph) and turn the steering wheel 27° or more.
  (b) Perform the following operation with the low beam headlights on and check that the headlight ECU sub-assembly LH performs medium-to-high speed control of the AFS (front-lighting adaptive system):
   - 
Drive the vehicle at a speed of 30 km/h (19 mph) or more and turn the steering wheel 7.5 degrees or more.
  (c) Perform any of the following operations and check that the headlight ECU sub-assembly LH cancels control of the AFS (front-lighting adaptive system):
   - 
The power switch not on (READY).
- 
Turn the low beam headlights off.
- 
Decrease the vehicle speed to less than 5 km/h (3 mph).
- 
Reduce the steering angle to less than 6 degrees.
- 
Move the shift lever to N or R.
 
READ NEXT:
	
   CUSTOMIZE PARAMETERS CUSTOMIZE AFS (ADAPTIVE FRONT-LIGHTING SYSTEM)  NOTICE:  
When the customer requests a change in a function, first make sure that the function can be customized.
 
Be sure to make
   
   
 
	
   INITIALIZATION  NOTICE:  
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during headlight 
   
   
 
	
   PROBLEM SYMPTOMS TABLE NOTICE: If the headlight ECU sub-assembly LH has been replaced, it is necessary to synchronize the vehicle information and initialize the headlight ECU sub-assembly LH. Click he
   
   
 
   SEE MORE:
	
   INSTALLATION PROCEDURE 1. INSTALL ENGINE WATER PUMP ASSEMBLY    (a) Install a new gasket and the engine water pump assembly with the 5 bolts in the order shown in the illustration. Torque:  10 N·m {102 kgf·cm, 7 ft·lbf}             2. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY    (a) Using a 12 mm 
   
   
 
	
   DTC CHECK / CLEAR CHECK FOR DTC (a) Turn the power switch off. (b) Connect the Techstream to the DLC3. (c) Turn the power switch on (IG). (d) Turn the Techstream on. (e) Enter the following menus: Body Electrical / Back Door / Trouble Codes. (f) Check for DTCs. Body Electrical > Back Door > Tr
   
   
 
 
	 
	
	
		
			© 2016-2025 Copyright www.lexunx.com
