INSTALLATION PROCEDURE 1. INSTALL BATTERY COOLING BLOWER ASSEMBLY LH CAUTION: Wear insulated gloves and use insulated tools. (a) Install the battery cooling blower assembly LH with the 3 nuts. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} (b) Connect the wire harness clamp and connector. 2. INSTALL BAT
OPERATION CHECK CHECK WINDOW DEFOGGER SYSTEM (a) Turn the power switch on (IG). (b) Check that the rear window defogger becomes warm by operating the rear window defogger switch of the air conditioning control assembly. (c) When the vehicle is stopped, confirm that the rear window defogger stops aft