Lexus NX: Operation Check

OPERATION CHECK

CHECK WINDSHIELD DEICER SYSTEM

(a) Turn the power switch on (IG).

(b) Check that the windshield deicer becomes warm by operating the windshield deicer switch of the multi-display assembly.

(c) When the vehicle is stopped, confirm that the windshield deicer stops after approximately 15 minutes.

NOTICE:

If the auxiliary battery voltage becomes low, windshield deicer operation is canceled to prioritize supplying power to the power steering system.

for Power Tilt and Power Telescopic Steering Column: Click here

for Manual Tilt and Manual Telescopic Steering Column: Click here

READ NEXT:

 Problem Symptoms Table

PROBLEM SYMPTOMS TABLE NOTICE: If the auxiliary battery voltage becomes low, windshield deicer operation is canceled to prioritize supplying power to the power steering system. for Power Tilt and Powe

 Terminals Of Ecu

TERMINALS OF ECU CHECK AIR CONDITIONING AMPLIFIER ASSEMBLY (a) Disconnect the I50 air conditioning amplifier assembly connector. (b) Measure the voltage and resistance according to the value(s) in th

 Data List / Active Test

DATA LIST / ACTIVE TEST ACTIVE TEST HINT: Using the Techstream to perform Active Tests allows relays, VSVs, actuators and other items to be operated without removing any parts. This non-intrusive func

SEE MORE:

 Shut Down Signal Circuit

DESCRIPTION The cause of the malfunction may be a shutdown signal. Check whether there is a shutdown signal +B short circuit. Related Parts Check Area Inspection Step HSDN terminal voltage Check that the HSDN terminal voltage decreases while READY OFF (IG ON). If the voltage is low, the

 Installation

INSTALLATION CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. A bolt without a torque specification is shown in the standard bolt chart. Click here PROCEDURE 1. INSTALL REAR DOOR INSIDE LOCKING CABLE ASSEMBLY LH

© 2016-2024 Copyright www.lexunx.com