Lexus NX: Operation Check
OPERATION CHECK
CHECK WINDSHIELD DEICER SYSTEM
(a) Turn the power switch on (IG).
(b) Check that the windshield deicer becomes warm by operating the windshield deicer switch of the multi-display assembly.
(c) When the vehicle is stopped, confirm that the windshield deicer stops after approximately 15 minutes.
NOTICE:
If the auxiliary battery voltage becomes low, windshield deicer operation is canceled to prioritize supplying power to the power steering system.
for Power Tilt and Power Telescopic Steering Column: Click here
for Manual Tilt and Manual Telescopic Steering Column: Click here
READ NEXT:
PROBLEM SYMPTOMS TABLE NOTICE: If the auxiliary battery voltage becomes low, windshield deicer operation is canceled to prioritize supplying power to the power steering system. for Power Tilt and Powe
TERMINALS OF ECU CHECK AIR CONDITIONING AMPLIFIER ASSEMBLY (a) Disconnect the I50 air conditioning amplifier assembly connector. (b) Measure the voltage and resistance according to the value(s) in th
DATA LIST / ACTIVE TEST ACTIVE TEST HINT: Using the Techstream to perform Active Tests allows relays, VSVs, actuators and other items to be operated without removing any parts. This non-intrusive func
SEE MORE:
DESCRIPTION The No. 1 stereo jack adapter assembly sends the sound data signal or image data signal from a USB device to the radio receiver assembly via this circuit. WIRING DIAGRAM PROCEDURE 1. CHECK HARNESS AND CONNECTOR (RADIO RECEIVER ASSEMBLY - NO. 1 STEREO JACK ADAPTER ASSEMBLY) (
DESCRIPTION These DTCs are stored when there is a CAN communication error between the hybrid vehicle control ECU, certification ECU (smart key ECU assembly), ECM, main body ECU (multiplex network body ECU) or combination meter assembly, and data from the option connector (bus buffer ECU) cannot be r
© 2016-2026 Copyright www.lexunx.com
