Lexus NX: CAN Communication Failure (Message Registry) (U1000)

Lexus NX Service Manual / Vehicle Exterior / Lighting (ext) / Lighting System (for Triple Beam Headlight) / CAN Communication Failure (Message Registry) (U1000)

DESCRIPTION

This DTC is output when an internal malfunction of the CAN communication-related ECU is stored.

DTC No.

Detection Item

DTC Detection Condition

Trouble Area

U1000

CAN Communication Failure (Message Registry)

A headlight ECU sub-assembly LH CAN communication function malfunction is detected

Headlight ECU sub-assembly LH

CAUTION / NOTICE / HINT

NOTICE:

If the headlight ECU sub-assembly LH has been replaced, it is necessary to synchronize the vehicle information and initialize the headlight ECU sub-assembly LH.

Click here

PROCEDURE

1.

CHECK FOR DTC

(a) Turn the power switch on (IG).

(b) Check for DTCs.

Click here

Body Electrical > AFS > Trouble Codes

OK:

DTC U1000 is not output.

OK

USE SIMULATION METHOD TO CHECK

NG

REPLACE HEADLIGHT ECU SUB-ASSEMBLY LH

READ NEXT:

 Turn Signal Switch Circuit

DESCRIPTION The combination meter receives the turn signal switch information and controls the turn signal lights. WIRING DIAGRAM CAUTION / NOTICE / HINT NOTICE: When replacing the combination meter

 Headlight Dimmer Switch Circuit

DESCRIPTION The main body ECU (multiplex network body ECU) receives light control switch signals, dimmer switch signals, fog light switch signals from the headlight dimmer switch. WIRING DIAGRAM CAUT

 Daytime Running Light Relay Circuit

DESCRIPTION The illumination of the daytime running light (clearance light assembly) or clearance light is controlled by the headlight ECU sub-assembly. WIRING DIAGRAM CAUTION / NOTICE / HINT NOTICE:

SEE MORE:

 Installation

INSTALLATION CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. INSTALL REAR NO. 1 SPRING BUMPER LH (a) Using SST, install the rear No. 1 spring bumper LH. SST: 09922-10010 Torque: Specified tightening

 Inspection

INSPECTION PROCEDURE 1. INSPECT WINDSHIELD WASHER MOTOR AND PUMP ASSEMBLY (for Front Side) HINT: This check should be performed with the windshield washer motor and pump assembly installed to the windshield washer jar assembly. (a) With the windshield washer motor and pump assembly installed to the

© 2016-2024 Copyright www.lexunx.com