PARTS LOCATION ILLUSTRATION *1 AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1) *2 CHARCOAL CANISTER ASSEMBLY *3 EGR VALVE ASSEMBLY *4 FUEL TANK CAP ASSEMBLY *5 HEATED OXYGEN SENS
SYSTEM DIAGRAM *1 ECM *2 Engine Coolant Temperature Sensor *3 Air Fuel Ratio Sensor (for Bank 1 Sensor 1) *4 Heated Oxygen Sensor (for Bank 1 Sensor 2) *5 Crankshaft Position
ON-VEHICLE INSPECTION PROCEDURE 1. VISUALLY INSPECT HOSES, CONNECTIONS AND GASKETS (a) Visually check that the hoses, connections and gaskets have no cracks, leaks or damage. NOTICE:
Detachment or
DESCRIPTION The parking brake ECU assembly is supplied with power to operate the motor via the +B and +B2 terminals. DTC No. Detection Item DTC Detection Condition Trouble Area Memory Note C13AD Open in +B Circuit All of following conditions are met:
Power switch on (IG) or e