PARTS LOCATION ILLUSTRATION *1 AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1) *2 CHARCOAL CANISTER ASSEMBLY *3 EGR VALVE ASSEMBLY *4 FUEL TANK CAP ASSEMBLY *5 HEATED OXYGEN SENS
SYSTEM DIAGRAM *1 ECM *2 Engine Coolant Temperature Sensor *3 Air Fuel Ratio Sensor (for Bank 1 Sensor 1) *4 Heated Oxygen Sensor (for Bank 1 Sensor 2) *5 Crankshaft Position
ON-VEHICLE INSPECTION PROCEDURE 1. VISUALLY INSPECT HOSES, CONNECTIONS AND GASKETS (a) Visually check that the hoses, connections and gaskets have no cracks, leaks or damage. NOTICE:
Detachment or
DESCRIPTION In the VVT (Variable Valve Timing) system, the appropriate intake valve open and close timing is controlled by the ECM. The ECM performs intake valve control by performing the following: 1) controlling the intake camshaft and camshaft timing oil control valve assembly, and operating the
DTC CHECK / CLEAR CHECK DTC (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the intelligent clearance sonar system on. (d) Turn the Techstream on. (e) Enter the following menus: Body Electrical / Advanced Parking Guidance/ICS/Intuitive P/A / Trouble Codes. (f) Che