Lexus NX: Initialization
INITIALIZATION
MAINTENANCE REQUIRED REMINDER RESET PROCEDURE (with mph units)
(a) Turn the power switch on (IG).
(b) Using the steering pad switch assembly, display the setting display on the multi-information display.
(c) Select "Maintenance System" from the setting display and perform initialization according to the multi-information display.
HINT:
After initialization is complete, "Initialization Completed" will be displayed on the multi-information display.
READ NEXT:
PROBLEM SYMPTOMS TABLE NOTICE:
When replacing the combination meter assembly, always replace it with a new one. If a combination meter assembly which was installed to another vehicle is used, the i
TERMINALS OF ECU COMBINATION METER ASSEMBLY (a) Measure the voltage, resistance and waveform according to the value(s) in the table below. Terminal No. (Symbol) Wiring Color Terminal Descripti
DTC CHECK / CLEAR CHECK DTC (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the Techstream on. (d) Enter the following menus: Body Electrical / Combination Meter /
SEE MORE:
COMPONENTS ILLUSTRATION *1 SHIFT LEVER ASSEMBLY *2 SHIFT LEVER CAP *3 SHIFT POSITION INDICATOR *4 SHIFTING HOLE COVER SUB-ASSEMBLY *5 TRANSMISSION CONTROL CABLE ASSEMBLY *6 REAR UPPER CONSOLE PANEL SUB-ASSEMBLY *7 NUT - - N*m (kgf*cm, ft.*lbf): Specifie
ComponentsCOMPONENTS ILLUSTRATION *1 REAR WASHER NOZZLE *2 REAR WASHER HOSE On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT REAR WASHER NOZZLE (a) With the power switch turned on (IG), check that the center stream of washer fluid sprays on the back door glass within th
© 2016-2026 Copyright www.lexunx.com
