Lexus NX: Initialization
INITIALIZATION
MAINTENANCE REQUIRED REMINDER RESET PROCEDURE (with mph units)
(a) Turn the power switch on (IG).
(b) Using the steering pad switch assembly, display the setting display on the multi-information display.
(c) Select "Maintenance System" from the setting display and perform initialization according to the multi-information display.
HINT:
After initialization is complete, "Initialization Completed" will be displayed on the multi-information display.
READ NEXT:
PROBLEM SYMPTOMS TABLE NOTICE:
When replacing the combination meter assembly, always replace it with a new one. If a combination meter assembly which was installed to another vehicle is used, the i
TERMINALS OF ECU COMBINATION METER ASSEMBLY (a) Measure the voltage, resistance and waveform according to the value(s) in the table below. Terminal No. (Symbol) Wiring Color Terminal Descripti
DTC CHECK / CLEAR CHECK DTC (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the Techstream on. (d) Enter the following menus: Body Electrical / Combination Meter /
SEE MORE:
REMOVAL CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The following procedure is for the LH side.
NOTICE:
While the auxiliary battery is connected, even if the power switch is off, the brake control system activates when the brake pedal is depressed or the
DESCRIPTION The ECM receives the fuel empty low level (below approximately 8.4 L) signal from the combination meter assembly (meter ECU) to detect if the vehicle is running out of fuel. DTC No. Detection Item DTC Detection Condition Trouble Area MIL Memory P3193 Fuel Run Out All
© 2016-2025 Copyright www.lexunx.com
