PRECAUTION FUEL RECEIVER GAUGE OPERATION (a) OPERATION The combination meter assembly uses the fuel injection volume signal from the ECM, fuel sender gauge assembly to detect the amount of fuel remain
On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT COOLING FAN ECU (a) Check and ensure the following conditions: (1) The power switch is off. (2) The engine coolant temperature is less than 92°C (198°F). (3) The auxiliary battery voltage is between 11 and 14 V. (4) The A/C switch is
TERMINALS OF ECU *a Component with harness connected (Power Steering ECU Assembly) - - CHECK POWER STEERING ECU ASSEMBLY (a) Measure the voltage and resistance according to the value(s) in the table below. NOTICE: When the power steering warning light (red) is illuminated due to a malfu