PRECAUTION FUEL RECEIVER GAUGE OPERATION (a) OPERATION The combination meter assembly uses the fuel injection volume signal from the ECM, fuel sender gauge assembly to detect the amount of fuel remain
INSPECTION PROCEDURE 1. INSPECT MAP LIGHT ASSEMBLY (RAIN SENSOR CIRCUIT) (a) Remove the map light assembly. Click here (b) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition T6-1 (IG) - T6-14 (IG2
CAUTION / NOTICE / HINT HINT:
Use the following procedure to troubleshoot the lighting system.
*: Use the Techstream.
PROCEDURE 1. VEHICLE BROUGHT TO WORKSHOP
NEXT 2. INSPECT AUXILIARY BATTERY VOLTAGE (a) Measure the auxiliary battery voltage with the power