Lexus NX: Installation

INSTALLATION

PROCEDURE

1. INSTALL REAR POWER OUTLET SOCKET COVER

(a) Attach the 2 claws to install the rear power outlet socket cover.

HINT:

Use the same procedure to install the other power outlet socket cover.

2. INSTALL REAR NO. 1 POWER OUTLET SOCKET ASSEMBLY

(a) Attach the claw to install the rear No. 1 power outlet socket assembly.

HINT:

Use the same procedure to install the other No. 1 power outlet socket assembly.

3. INSTALL DECK TRIM SIDE PANEL ASSEMBLY LH

Click here

4. INSTALL NO. 1 LUGGAGE COMPARTMENT TRIM HOOK

Click here

5. INSTALL LUGGAGE HOLD BELT STRIKER ASSEMBLY

Click here

6. INSTALL ROPE HOOK ASSEMBLY

Click here

7. INSTALL UPPER DECK TRIM SIDE BOARD LH

Click here

8. INSTALL REAR DOOR OPENING TRIM WEATHERSTRIP LH

Click here

9. INSTALL REAR FLOOR FINISH PLATE

Click here

10. INSTALL REAR SEAT ASSEMBLY

(a) for Power Seat:

Click here

(b) for Manual Seat:

Click here

READ NEXT:

 Power Point Socket(for Console Box)

ComponentsCOMPONENTS ILLUSTRATION *1 NO. 1 POWER OUTLET SOCKET ASSEMBLY *2 NO. 1 POWER OUTLET SOCKET COVER *3 NO. 3 BOX PANEL - - RemovalREMOVAL PROCEDURE 1. REMOVE NO. 3 BOX

 Relay

On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT POWER OUTLET SOCKET RELAY (a) Remove the power outlet socket relay. (b) Measure the resistance according to the value(s)

 Voltage Inverter

ComponentsCOMPONENTS ILLUSTRATION *1 DECK BOARD ASSEMBLY *2 DECK FLOOR BOX LH *3 NO. 2 DECK BOARD SUB-ASSEMBLY *4 NO. 3 DECK BOARD SUB-ASSEMBLY *5 REAR DECK FLOOR BOX -

SEE MORE:

 Freeze Frame Data

FREEZE FRAME DATA DESCRIPTION (a) Whenever a road sign assist system DTC is stored, the forward recognition camera stores the current vehicle state (ECU and sensor information) as freeze frame data. CHECK FREEZE FRAME DATA (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c

 Catalyst System Efficiency Below Threshold (Bank 1) (P0420)

MONITOR DESCRIPTION The ECM uses sensors mounted in front of and behind the Three-Way Catalytic Converter (TWC) to monitor its efficiency. The first sensor, the air fuel ratio sensor, sends pre-catalyst information to the ECM. The second sensor, the heated oxygen sensor, sends post-catalyst informat

© 2016-2026 Copyright www.lexunx.com