Lexus NX: On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT COOLING FAN SYSTEM
(a) Connect the Techstream to the DLC3.
(b) Turn the power switch on (IG).
(c) Turn the Techstream on.
(d) Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Electric Cooling Fan.
Powertrain > Engine and ECT > Active Test
| Tester Display |
| Control the Electric Cooling Fan |
| (e) Check the operation of the cooling fans while operating them using the Techstream. OK: | Tester Operation | Fan Operation | | ON | Cooling fans operate | | OFF | Cooling fans stop | If the cooling fan motor does not operate, check the cooling fan circuit. Click here | |
READ NEXT:
DESCRIPTION The ECM calculates an appropriate cooling fan speed based on the engine coolant temperature, air conditioning switch condition, refrigerant pressure, hybrid coolant temperature, engine spe
On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT FOR COOLANT LEAK CAUTION: To avoid the danger of being burned, do not remove the radiator reservoir cap while the engine assembly and r
SEE MORE:
DESCRIPTION The electronic throttle control system is composed of the throttle actuator, throttle position sensor, and ECM. The ECM operates the throttle actuator to regulate the throttle valve in response to a request from the hybrid system. The throttle position sensor detects the opening angle of
DIAGNOSIS SYSTEM CHECK DLC3 (a) Check the DLC3. Click here INSPECT AUXILIARY BATTERY VOLTAGE (a) Measure the auxiliary battery voltage. Standard voltage: 11 to 14 V (power switch off) If the voltage is below 11 V, recharge or replace the auxiliary battery.
© 2016-2025 Copyright www.lexunx.com
