INSTALLATION PROCEDURE 1. INSTALL FORWARD RECOGNITION CAMERA NOTICE:
When replacing the forward recognition camera, replace it with a new one.
If the forward recognition camera has been struck or dropped, replace it with a new one.
If the forward recognition camera is not properly installed,
INSPECTION PROCEDURE 1. INSPECT AIR FUEL RATIO SENSOR (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 1 (HA1A) - 2 (+B) 20°C (68°F) 1.6 to 3.2 Ω If the result is not as specified, r