Lexus NX: Reassembly

REASSEMBLY

PROCEDURE

1. INSTALL NO. 1 COMBINATION METER MIRROR PLATE

(a) Attach the 10 claws to install the No. 1 combination meter mirror plate to the meter mirror sub-assembly (headup display).

READ NEXT:

 Installation

INSTALLATION PROCEDURE 1. INSTALL METER MIRROR SUB-ASSEMBLY (HEADUP DISPLAY) (a) Install the meter mirror sub-assembly (headup display) with the 4 screws. *a Screw *b Connector

 Headup Display Switch

 Components

COMPONENTS ILLUSTRATION *1 CONSOLE ARMREST ASSEMBLY *2 HEADUP DISPLAY SWITCH ASSEMBLY *3 INSTRUMENT SIDE PANEL LH *4 LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL *5 NO. 1 INSTRU

SEE MORE:

 Back-up Power Source Circuit

DESCRIPTION The back-up power source circuit for the air conditioning amplifier assembly is shown below. Power is supplied even when the power switch is off. The power is used for diagnostic trouble code memory, etc. WIRING DIAGRAM CAUTION / NOTICE / HINT NOTICE: Inspect the fuses for circuits rela

 Telephone Sub Antenna Circuit Short to Ground (B153711,B153713)

DESCRIPTION These DTCs are stored when a malfunction occurs in the telephone antenna (navigation antenna assembly) DTC No. Detection Item DTC Detection Condition Trouble Area B153711 Telephone Sub Antenna Circuit Short to Ground Telephone antenna (sub) impedance (Ω) is lower than t

© 2016-2025 Copyright www.lexunx.com