Lexus NX: Upper Instrument Panel

READ NEXT:

 Precaution

PRECAUTION PRECAUTION FOR VEHICLE WITH AIRBAG (a) Some operations in this section may affect the airbag. Prior to performing the corresponding operations, read the SRS Precaution. Click here

 Components

COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified

 Removal

REMOVAL PROCEDURE 1. TABLE OF BOLT, SCREW AND CLIP HINT: All bolts, screws, and clips relevant to installing and removing the instrument panel are shown along with their alphabet code in the table bel

SEE MORE:

 Operation Check

OPERATION CHECK CHECK WINDSHIELD DEICER SYSTEM (a) Turn the power switch on (IG). (b) Check that the windshield deicer becomes warm by operating the windshield deicer switch of the multi-display assembly. (c) When the vehicle is stopped, confirm that the windshield deicer stops after approximately 1

 Installation

INSTALLATION PROCEDURE 1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY (SEAT BELT WARNING LIGHT) (a) Connect the 2 connectors. (b) Attach the 6 clips to install the air conditioning control assembly (seat belt warning light). NOTICE: Do not touch the switch, display or clock parts. 2. IN

© 2016-2026 Copyright www.lexunx.com