Lexus NX: 2ar-fxe (battery / Charging)

Lexus NX Service Manual / Power Source & Network / 2ar-fxe (battery / Charging)

READ NEXT:

 Auxiliary Battery

 Removal

REMOVAL PROCEDURE 1. PRECAUTION NOTICE: After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Click here

 Installation

INSTALLATION PROCEDURE 1. INSTALL AUXILIARY BATTERY (a) Install the auxiliary battery. (b) Install the battery insulator to the auxiliary battery. (c) Install the L-shaped pipe section

SEE MORE:

 Operation Check

OPERATION CHECK CHECK OUTER MIRROR SWITCH FUNCTION (a) Turn the power switch on (ACC). (b) With the mirror select switch set to L, check that the mirror surface moves up, down, left and right normally. (c) With the mirror select switch set to R, check that the mirror surface moves up, down, left and

 Inspection

INSPECTION PROCEDURE 1. INSPECT OUTER REAR VIEW MIRROR ASSEMBLY LH (a) Check the operation of the mirror surface. (1) Disconnect the outer rear view mirror assembly LH connector. *a Component without harness connected (Outer Rear View Mirror Assembly LH) (2) Apply auxiliar

© 2016-2026 Copyright www.lexunx.com