INSTALLATION PROCEDURE 1. INSTALL SLIDING ROOF HOUSING SUB-ASSEMBLY (a) Temporarily install the sliding roof housing sub-assembly with the 8 bolts and 8 nuts. (b) Tighten the nuts in the order indicated in the illustration. Torque: 8.0 N·m {82 kgf·cm, 71 in·lbf} (c) Insert the sliding roof drai
DISASSEMBLY CAUTION / NOTICE / HINT NOTICE: Do not try to remove the black nylon tube as it is welded to the fuel suction tube assembly. Click here PROCEDURE 1. REMOVE NO. 1 FUEL SUB-TANK (a) Disconnect the fuel pump harness connector. (b) Using needle nose pliers, remove the fuel