INSTALLATION PROCEDURE 1. INSTALL IGNITION COIL ASSEMBLY Click here 2. INSTALL SENSOR WIRE (a) Install the sensor wire with the bolt. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} (b) Connect the knock control sensor connector. 3. INSTALL INJECTOR VIBRATION INSULATOR Click here 4. INSTALL FUEL DELI
DATA LIST / ACTIVE TEST DATA LIST NOTICE: In the following table, the values listed under "Normal Condition" are reference values. Do not depend solely on these reference values when deciding whether a part is faulty or not. HINT: Using the Techstream to read the Data List allows the values or state