Lexus NX: Clearance Warning Ecu
READ NEXT:
COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified
REMOVAL PROCEDURE 1. PRECAUTION NOTICE: After the power switch is turned off, there may be a waiting time before disconnecting the negative (-) auxiliary battery terminal. Click here 2. REMOVE NO. 3
INSTALLATION PROCEDURE 1. INSTALL CLEARANCE WARNING ECU ASSEMBLY (a) Attach the 2 claws to install the clearance warning ECU assembly. 2. INSTALL ECU INTEGRATION BOX RH Click here 3. INSTALL NO. 2 I
SEE MORE:
DESCRIPTION The ABS main relay supplies power to the changeover solenoid and the linear solenoid. The ABS main relay remains on for approximately 2 minutes after the power switch is turned off and the input of brake pedal operation signals stops, and supplies power to the system to keep it ready to
DTC CHECK / CLEAR CHECK DTC (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the Techstream on. (d) Enter the following menus: Body Electrical / Road Sign Assist / Trouble Codes. Body Electrical > Road Sign Assist > Trouble Codes (e) Check for DTCs (Test Fail