InspectionINSPECTION PROCEDURE 1. INSPECT COMBINATION SWITCH ASSEMBLY (BLIND SPOT MONITOR MAIN SWITCH) (a) Remove the combination switch assembly. Click here (b) Measure the resistance according
RemovalREMOVAL CAUTION / NOTICE / HINT NOTICE:
Avoid any impact to the blind spot monitor sensor.
Do not drop the blind spot monitor sensor. If it is dropped, replace it with a new one.
PROCE
DESCRIPTION The inverter contains a three-phase bridge circuit, which consists of 6 power transistors (IGBTs) each for the generator (MG1), motor (MG2) and rear motor (MGR). The inverter converts high-voltage direct current from the HV battery into three-phase alternating current for the generator (