Lexus NX: Components
COMPONENTS
ILLUSTRATION
*1 | DECK FLOOR BOX LH | *2 | NO. 3 DECK BOARD SUB-ASSEMBLY |
*3 | REAR DECK FLOOR BOX | *4 | NEGATIVE AUXILIARY BATTERY TERMINAL |
| N*m (kgf*cm, ft.*lbf): Specified torque | - | - |
ILLUSTRATION
*1 | BATTERY SERVICE HOLE COVER | *2 | HYBRID BATTERY SERVICE PLUG COVER |
*3 | SERVICE PLUG GRIP | - | - |
| N*m (kgf*cm, ft.*lbf): Specified torque | - | - |
READ NEXT:
REMOVAL PROCEDURE 1. PRECAUTION CAUTION: The hybrid system has high-voltage circuits. Accidents, such as electric shock, or electric leaks may result if the hybrid system is not operated in a correct
INSPECTION PROCEDURE 1. INSPECT SERVICE PLUG GRIP (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Conditi
INSTALLATION PROCEDURE 1. INSTALL SERVICE PLUG GRIP CAUTION: Wear insulating gloves. NOTICE: Before connecting the service plug, check that no parts and tools remain and that the high voltage terminal
SEE MORE:
DESCRIPTION When the clearance warning ECU assembly detects that the steering angle neutral point memorization is incomplete during self-diagnosis, C1AEA is stored. DTC No. Detection Item DTC Detection Condition Trouble Area C1AEA Steering Angle Midpoint Initial Setting Incomplete S
INSPECTION PROCEDURE 1. INSPECT HEADLIGHT DIMMER SWITCH ASSEMBLY (a) Inspect the light control switch. (1) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Switch Condition Specified Condition
*1: w/ Light Control Switch Off P