OPERATION CHECK CHECK POWER SEAT FUNCTION *A for Driver Side *a Slide Function *b Reclining Function *c Rear Lifter Function *d Front Vertical Function *e Lumbar Su
INSTALLATION PROCEDURE 1. INSTALL QUICK HEATER ASSEMBLY (a) Install the quick heater assembly with the screw. (b) Attach the clamp and connect the 2 connectors. 2. INSTALL NO. 1 AIR DUCT Click here 3. INSTALL LOWER INSTRUMENT PANEL Click here
DTC SUMMARY MALFUNCTION DESCRIPTION This DTC indicates that a large current flowed in the inverter for the generator. The cause of this malfunction may be one of the following: Area Main Malfunction Description Step Inverter low-voltage circuit The connectors are not connected properly