INSTALLATION PROCEDURE 1. INSTALL BATTERY COOLING BLOWER ASSEMBLY LH CAUTION: Wear insulated gloves and use insulated tools. (a) Install the battery cooling blower assembly LH with the 3 nuts. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} (b) Connect the wire harness clamp and connector. 2. INSTALL BAT
FREEZE FRAME DATA FREEZE FRAME DATA (a) Whenever an automatic headlight beam level control system DTC is stored, the headlight ECU subassembly LH stores the current vehicle state as freeze frame data. CHECK FREEZE FRAME DATA (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG).