Lexus NX: Installation
INSTALLATION
PROCEDURE
1. INSTALL TRANSMITTER BATTERY
Click here
2. INSTALL TRANSMITTER (CARD KEY) BATTERY
Click here
READ NEXT:
COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified
REMOVAL CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE 1. PRECAUTION NOTICE: After turning the power swi
SEE MORE:
DESCRIPTION The front side squib RH circuit consists of the airbag ECU assembly and front seat airbag assembly RH. This circuit instructs the SRS to deploy when deployment conditions are met. These DTCs are stored when a malfunction is detected in the front side squib RH circuit. DTC No. Detect
REMOVAL PROCEDURE 1. REMOVE DECK BOARD ASSEMBLY (a) Remove the deck board assembly. 2. REMOVE NO. 3 DECK BOARD SUB-ASSEMBLY (a) Remove the No. 3 deck board sub-assembly. 3. REMOVE REAR DECK FLOOR BOX (a) Remove the rear deck floor box. 4. REMOVE DECK FLOO
© 2016-2026 Copyright www.lexunx.com
