Lexus NX: Installation
INSTALLATION
PROCEDURE
1. INSTALL TRANSMITTER BATTERY
Click here
2. INSTALL TRANSMITTER (CARD KEY) BATTERY
Click here
READ NEXT:
COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified
REMOVAL CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE 1. PRECAUTION NOTICE: After turning the power swi
SEE MORE:
INSPECTION PROCEDURE 1. INSPECT BRAKE BOOSTER PUMP ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition A51-1 (BM1) - A51-2 (GND1) Always Below 10 Ω A52-2 (BM2) - A52-1 (GND2)
TERMINALS OF ECU NOTICE:
DTCs may be output when connectors are disconnected during inspection. Therefore, be sure to clear the DTCs using the Techstream once the inspection has been completed.
Do not apply larger loads than necessary since the connector may be damaged.
CHECK FORWARD RECOGN
© 2016-2026 Copyright www.lexunx.com
