Lexus NX: Installation
INSTALLATION
PROCEDURE
1. INSTALL BLOWER ASSEMBLY
(a) Attach the 2 claws to install the blower assembly.
(b) Install the 2 screws.
(c) Attach the 3 clamps to install the air conditioning harness assembly.
(d) Connect the No. 1 blower damper servo sub-assembly connector.
2. INSTALL AIR CONDITIONING UNIT ASSEMBLY
Click here
READ NEXT:
COMPONENTS ILLUSTRATION *1 BATTERY SERVICE HOLE COVER *2 HYBRID BATTERY SERVICE PLUG COVER *3 SERVICE PLUG GRIP - - N*m (kgf*cm, ft.*lbf): Specified torque - - ILLUST
REMOVAL PROCEDURE 1. RECOVER REFRIGERANT FROM REFRIGERATION SYSTEM Click here 2. REMOVE BATTERY SERVICE HOLE COVER Click here 3. REMOVE HYBRID BATTERY SERVICE PLUG COVER Click here 4. REMOVE
SEE MORE:
PRECAUTION WHEN DISCONNECTING AUXILIARY BATTERY CABLE (a) After the power switch is turned off, the radio receiver assembly requires approximately 6 minutes to record various types of memory and settings. As a result, after turning the power switch off, wait 6 minutes or more before disconnecting th
PROCEDURE 1. CHECK CONDITION (a) Check with the customer if the vehicle has been turned by a turntable. OK: Vehicle has not been turned by a turntable. HINT: If the vehicle is turned on a turntable with the power switch on (IG), the system may store the angular velocity. As a result, th
© 2016-2026 Copyright www.lexunx.com
