Lexus NX: Installation
INSTALLATION
PROCEDURE
1. INSTALL BLOWER ASSEMBLY
(a) Attach the 2 claws to install the blower assembly.
(b) Install the 2 screws.
(c) Attach the 3 clamps to install the air conditioning harness assembly.
(d) Connect the No. 1 blower damper servo sub-assembly connector.
2. INSTALL AIR CONDITIONING UNIT ASSEMBLY
Click here
READ NEXT:
COMPONENTS ILLUSTRATION *1 BATTERY SERVICE HOLE COVER *2 HYBRID BATTERY SERVICE PLUG COVER *3 SERVICE PLUG GRIP - - N*m (kgf*cm, ft.*lbf): Specified torque - - ILLUST
REMOVAL PROCEDURE 1. RECOVER REFRIGERANT FROM REFRIGERATION SYSTEM Click here 2. REMOVE BATTERY SERVICE HOLE COVER Click here 3. REMOVE HYBRID BATTERY SERVICE PLUG COVER Click here 4. REMOVE
SEE MORE:
MONITOR DESCRIPTION This monitor will run when the engine is started at an engine coolant temperature of -10 to 50°C (14 to 122°F). The DTC is stored after the engine idles for 13 seconds (2 trip detection logic). The DTC is designed to monitor the ignition timing at cold start. When the engine is
WIRING DIAGRAM CAUTION / NOTICE / HINT NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
Before disconnecting connectors or fuses, turn the power switch off and wait 20 seconds or more.
When replacing the parking brake ECU ass
© 2016-2026 Copyright www.lexunx.com
