Lexus NX: Installation
INSTALLATION
PROCEDURE
1. INSTALL BLOWER ASSEMBLY
(a) Attach the 2 claws to install the blower assembly.
(b) Install the 2 screws.
(c) Attach the 3 clamps to install the air conditioning harness assembly.
(d) Connect the No. 1 blower damper servo sub-assembly connector.
2. INSTALL AIR CONDITIONING UNIT ASSEMBLY
Click here
READ NEXT:
COMPONENTS ILLUSTRATION *1 BATTERY SERVICE HOLE COVER *2 HYBRID BATTERY SERVICE PLUG COVER *3 SERVICE PLUG GRIP - - N*m (kgf*cm, ft.*lbf): Specified torque - - ILLUST
REMOVAL PROCEDURE 1. RECOVER REFRIGERANT FROM REFRIGERATION SYSTEM Click here 2. REMOVE BATTERY SERVICE HOLE COVER Click here 3. REMOVE HYBRID BATTERY SERVICE PLUG COVER Click here 4. REMOVE
SEE MORE:
ComponentsCOMPONENTS ILLUSTRATION *1 IGNITION COIL ASSEMBLY *2 NO. 1 ENGINE COVER SUB-ASSEMBLY *3 SPARK PLUG - - N*m (kgf*cm, ft.*lbf) : Specified torque - - RemovalREMOVAL PROCEDURE 1. REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY Click here 2. REMOVE IGNITION COIL
INSTALLATION PROCEDURE 1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY (a) Connect the 2 connectors. (b) Attach the 6 clips to install the air conditioning control assembly. NOTICE: Do not touch the switch, display or clock parts. 2. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBL
© 2016-2026 Copyright www.lexunx.com
