REMOVAL PROCEDURE 1. RECOVER REFRIGERANT FROM REFRIGERATION SYSTEM Click here 2. REMOVE BATTERY SERVICE HOLE COVER Click here 3. REMOVE HYBRID BATTERY SERVICE PLUG COVER Click here 4. REMOVE
INSTALLATION PROCEDURE 1. INSPECT COMPRESSOR OIL (a) When replacing the compressor assembly with motor with a new one, gradually discharge the inert gas from the service valve, and drain the follow
WIRING DIAGRAM CAUTION / NOTICE / HINT NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
Before disconnecting connectors or fuses, turn the power switch off and wait 20 seconds or more.
When replacing the parking brake ECU ass
DESCRIPTION The Variable Valve Timing (VVT) system adjusts the intake valve timing to improve driveability. The engine oil pressure turns the VVT controller to adjust the valve timing. The camshaft timing oil control valve assembly is a solenoid valve and switches the engine oil line. The valve move