Lexus NX: Installation
INSTALLATION
PROCEDURE
1. INSTALL ELECTRICAL KEY ANTENNA
NOTICE:
Do not reuse dropped or damaged parts.
(a) Attach the guide and install the electrical key antenna with the nut.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
(b) Connect the connector.
2. INSTALL REAR BUMPER COVER
Click here
3. INSTALL REAR FLOOR SIDE MEMBER COVER
Click here
4. INSTALL QUARTER OUTSIDE MOULDING SUB-ASSEMBLY RH
Click here
5. INSTALL QUARTER OUTSIDE MOULDING SUB-ASSEMBLY LH
Click here
READ NEXT:
ComponentsCOMPONENTS ILLUSTRATION *1 NO. 2 CONSOLE BOX MOUNTING BRACKET *2 NO. 2 INDOOR ELECTRICAL KEY ANTENNA ASSEMBLY N*m (kgf*cm, ft.*lbf): Specified torque - - RemovalREM
ComponentsCOMPONENTS ILLUSTRATION *1 HOOD LOCK ASSEMBLY (ENGINE HOOD COURTESY SWITCH) *2 RADIATOR SUPPORT OPENING COVER N*m (kgf*cm, ft.*lbf) : Specified torque MP grease Re
ComponentsCOMPONENTS ILLUSTRATION *1 AIR CONDITIONER UNIT ASSEMBLY *2 ID CODE BOX (IMMOBILIZER CODE ECU) InstallationINSTALLATION PROCEDURE 1. INSTALL ID CODE BOX (IMMOBILIZER CODE ECU)
SEE MORE:
DESCRIPTION Refer to the description for DTC P0A37-260. Click here DTC No. Detection Item DTC Detection Condition Trouble Area MIL Warning Indicate P0A38-257 Generator Temperature Sensor Circuit Low Short to ground in the generator temperature sensor circuit (1 trip detection
INSPECTION PROCEDURE 1. INSPECT ACCELERATION SENSOR (a) Connect 3 1.5 V dry cell batteries in series. (b) Connect a positive (+) lead from the batteries to terminal 3 (SGB) and a negative (-) lead to terminal 2 (SGG). (c) Measure the voltage according to the value(s) in the table below. Standard Vol
© 2016-2026 Copyright www.lexunx.com
