Lexus NX: Installation
INSTALLATION
PROCEDURE
1. INSTALL ELECTRICAL KEY ANTENNA
NOTICE:
Do not reuse dropped or damaged parts.
(a) Attach the guide and install the electrical key antenna with the nut.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
(b) Connect the connector.
2. INSTALL REAR BUMPER COVER
Click here
3. INSTALL REAR FLOOR SIDE MEMBER COVER
Click here
4. INSTALL QUARTER OUTSIDE MOULDING SUB-ASSEMBLY RH
Click here
5. INSTALL QUARTER OUTSIDE MOULDING SUB-ASSEMBLY LH
Click here
READ NEXT:
ComponentsCOMPONENTS ILLUSTRATION *1 NO. 2 CONSOLE BOX MOUNTING BRACKET *2 NO. 2 INDOOR ELECTRICAL KEY ANTENNA ASSEMBLY N*m (kgf*cm, ft.*lbf): Specified torque - - RemovalREM
ComponentsCOMPONENTS ILLUSTRATION *1 HOOD LOCK ASSEMBLY (ENGINE HOOD COURTESY SWITCH) *2 RADIATOR SUPPORT OPENING COVER N*m (kgf*cm, ft.*lbf) : Specified torque MP grease Re
ComponentsCOMPONENTS ILLUSTRATION *1 AIR CONDITIONER UNIT ASSEMBLY *2 ID CODE BOX (IMMOBILIZER CODE ECU) InstallationINSTALLATION PROCEDURE 1. INSTALL ID CODE BOX (IMMOBILIZER CODE ECU)
SEE MORE:
VEHICLE CONTROL HISTORY NOTICE: Make sure to record any output Vehicle Control History codes before clearing them and checking the Vehicle Control History again. CHECK VEHICLE CONTROL HISTORY (ROAD SIGN ASSIST SYSTEM) (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Tur
DESCRIPTION Detection Item Symptom Trouble Area Combination Meter ECU Communication Stop Mode Any of the following conditions are met:
Communication stop for "Combination Meter" is indicated on the "Communication Bus Check" screen of the Techstream.
Click here
Communication sys
© 2016-2026 Copyright www.lexunx.com
