INSTALLATION PROCEDURE 1. INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY CAUTION: Wear insulated gloves and use insulated tools. (a) Install the hybrid battery junction block assembly with the 3 nuts. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} NOTICE: If the hybrid battery junction block assembly has be
DIAGNOSIS SYSTEM DESCRIPTION (a) Front power seat control system (w/ Memory) data and Diagnostic Trouble Codes (DTCs) can be read through the Data Link Connector 3 (DLC3) of the vehicle. When the system seems to be malfunctioning, use the Techstream to check for malfunctions and perform repairs. CHE