REASSEMBLY CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE 1. INSTALL NO. 3 MOULDING TAPE (a) Clean the No. 3 moulding tape installation surface. (1) When reusing the side mudguard LH, remove the double-si
INSTALLATION PROCEDURE 1. INSTALL ABSORBER CONTROL ECU (a) Install the absorber control ECU with the 2 bolts. Torque: 8.5 N·m {87 kgf·cm, 75 in·lbf} NOTICE:
Avoid any impact to the absorber control ECU.
Do not drop the absorber control ECU. If it is dropped, replace it with a new one.
(b