INSPECTION PROCEDURE 1. INSPECT AIR CONDITIONING THERMISTOR ASSEMBLY (HUMIDITY SENSOR) (a) for Glass temperature sensor: (1) Measure the resistance according to the value(s) in the table below. *a
INSTALLATION PROCEDURE 1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH) (a) Install the integration control and panel assembly (VSC OFF switch) to the upper rear console panel sub-assembly with the 2 screws. HINT: The locations labeled A in the illustration are tightened togethe
COMPONENTS ILLUSTRATION *1 COOLING FAN ECU *2 COOLING FAN MOTOR *3 COOLING FAN WIRE *4 FAN *5 NO. 2 COOLING FAN MOTOR *6 NO. 2 FAN *7 COOLING FAN MOTOR INSULATOR - - N*m (kgf*cm, ft.*lbf): Specified torque - -