Lexus NX: Problem Symptoms Table
PROBLEM SYMPTOMS TABLE
NOTICE:
If the headlight ECU sub-assembly LH has been replaced, it is necessary to synchronize the vehicle information and initialize the headlight ECU sub-assembly LH.
Click here
HINT:
-
Use the table below to help determine the cause of problem symptoms. If multiple suspected areas are listed, the potential causes of the symptoms are listed in order of probability in the "Suspected Area" column of the table. Check each symptom by checking the suspected areas in the order they are listed. Replace parts as necessary.
-
Inspect the fuses related to this system before inspecting the suspected areas below.
Automatic Headlight Beam Level Control System
| Symptom | Suspected Area | Link |
| Automatic headlight beam level control system does not operate (Left Headlight) | Headlight unit assembly LH | |
| Headlight ECU sub-assembly LH | |
| Automatic headlight beam level control system does not operate (Right Headlight) | Headlight unit assembly RH | |
| Headlight ECU sub-assembly RH | |
READ NEXT:
TERMINALS OF ECU CHECK HEADLIGHT ECU SUB-ASSEMBLY LH (a) Disconnect the A19 headlight sub-assembly LH connector. (b) Measure the resistance and voltage according to the value(s) in the table below.
DIAGNOSIS SYSTEM DESCRIPTION (a) Lighting system data and the Diagnostic Trouble Codes (DTCs) can be read from the Data Link Connector 3 (DLC3) of the vehicle. When the system seems to be malfunctioni
DTC CHECK / CLEAR CHECK FOR DTC (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the Techstream on. (d) Enter the following menus: Body Electrical / AFS / Trouble Co
SEE MORE:
INSTALLATION CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
A bolt without a torque specification is shown in the standard bolt chart.
Click here PROCEDURE 1. INSTALL FRONT DOOR INSIDE LOCKING CABLE ASSEMBLY LH
ON-VEHICLE INSPECTION CAUTION / NOTICE / HINT NOTICE: DTCs may be stored during the inspection procedure. Be sure to clear the DTCs and check that no DTCs are output after the inspection is finished. PROCEDURE 1. INSPECT PRESSURE SENSOR (a) Check auxiliary battery voltage. Standard voltage: 11 to 1
© 2016-2025 Copyright www.lexunx.com
