Lexus NX: Rear Door Belt Moulding

READ NEXT:

 Components

COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified

 Removal

REMOVAL CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. PRECAUTION NOTICE: After the power switch off

 Installation

INSTALLATION CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. INSTALL REAR DOOR BELT MOULDING ASSEMBLY

SEE MORE:

 Dtc Check / Clear

DTC CHECK / CLEAR NOTICE: When using the Techstream with the power switch off, connect the Techstream to the DLC3 and turn a courtesy light switch on and off at intervals of 1.5 seconds or less until communication between the Techstream and the vehicle begins. Then select the vehicle type under manu

 Installation

INSTALLATION PROCEDURE 1. INSTALL ENGINE WATER PUMP ASSEMBLY (a) Install a new gasket and the engine water pump assembly with the 5 bolts in the order shown in the illustration. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} 2. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY (a) Using a 12 mm

© 2016-2026 Copyright www.lexunx.com