INSTALLATION PROCEDURE 1. INSTALL BATTERY COOLING BLOWER ASSEMBLY LH CAUTION: Wear insulated gloves and use insulated tools. (a) Install the battery cooling blower assembly LH with the 3 nuts. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} (b) Connect the wire harness clamp and connector. 2. INSTALL BAT
REMOVAL PROCEDURE 1. REMOVE NO. 3 DECK BOARD SUB-ASSEMBLY Click here 2. REMOVE REAR DECK FLOOR BOX Click here 3. REMOVE DECK FLOOR BOX LH Click here 4. PRECAUTION CAUTION: Be sure to read Precaution thoroughly before servicing. Click here NOTICE: After the power switch is turned off, there m