Lexus NX: Rear Door Belt Moulding
READ NEXT:
COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified
REMOVAL CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE 1. PRECAUTION NOTICE: After the power switch off
INSTALLATION CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE 1. INSTALL REAR DOOR BELT MOULDING ASSEMBLY
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL COMBINATION SWITCH ASSEMBLY (for Upper Side) (a) Attach the 4 claws to install the combination switch assembly. 2. INSTALL NO. 2 COMBINATION SWITCH ASSEMBLY (for Lower Side) (a) Attach the 4 claws to install the No. 2 combination switch assembly.
ComponentsCOMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified torque - - ILLUSTRATION *1 TELEPHONE AND GPS ANTENNA (ROOF ANTENNA ASSEMBLY)