Lexus NX: Rear Door Belt Moulding
READ NEXT:
COMPONENTS ILLUSTRATION *1 DECK FLOOR BOX LH *2 NO. 3 DECK BOARD SUB-ASSEMBLY *3 REAR DECK FLOOR BOX *4 NEGATIVE AUXILIARY BATTERY TERMINAL N*m (kgf*cm, ft.*lbf): Specified
REMOVAL CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE 1. PRECAUTION NOTICE: After the power switch off
INSTALLATION CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE 1. INSTALL REAR DOOR BELT MOULDING ASSEMBLY
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL NO. 4 FUEL TUBE CLAMP (a) Install the 5 No. 4 fuel tube clamps to the fuel tank assembly as shown in the illustration. 2. INSTALL FUEL TANK MAIN TUBE SUB-ASSEMBLY (a) Connect the 5 clamps and install the fuel tank main tube sub-assembly to the 5 No. 4
DIAGNOSTIC TROUBLE CODE CHART Airbag System DTC No. Detection Item Link B1000 Airbag ECU Malfunction B1610 Front Airbag Sensor (RH) B1612 Front Airbag Sensor Lost Communication (RH) B1613 Front Airbag Sensor Initialization Error (RH) B1615 Fro