InspectionINSPECTION PROCEDURE 1. INSPECT POWER BACK DOOR MAIN SWITCH (a) Check the resistance. (1) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Switch Condition Specified Condition 16 (L) - 6 (B) Switch off 10 kΩ or