ComponentsCOMPONENTS ILLUSTRATION *1 PCV VALVE SUB-ASSEMBLY *2 NO. 2 PCV HOSE N*m (kgf*cm, ft.*lbf): Specified torque Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent ★ Precoated part - - RemovalREMOVAL PROCEDURE 1. REMOVE INTAKE MANIFOLD Click here
On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT PTC HEATER RELAY(PTC HTR NO. 1, NO. 3) (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 3 - 5 Auxiliary battery voltage is no