PRECAUTION FOR OPERATION OF ELECTRICAL ITEMS RESTRICTED NOTICE:
If the auxiliary battery voltage is low, the seat heater system may not operate. When "High Power Consumption / Partial Limit On AC/H
INSTALLATION CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
A bolt without a torque specification is shown in the standard bolt chart.
Click here PROCEDURE 1. CLEAN QUARTER WINDOW ASSEMBLY LH (a) Clean the o
INSTALLATION PROCEDURE 1. INSTALL TRANSMISSION OIL COOLER ASSEMBLY (a) Insert the stud bolts E through the transmission oil cooler assembly. *a Torque Wrench Fulcrum Length (b) Temporarily install the transmission oil cooler assembly and a new gasket with the flare nut B a